Third Field test 14.6.2017
The pressure housings had been welded, front acrylic windows cut and the O-ring prepared, time for the first pressure test. The O-rimg has been greased with silicone , then the housing was closed. First the housing has been lowered to ca. 30 m still with a safety cord attached, as the performance of fishing reel and line was not known.